[1]
Yesugey, S. and Karakaya, A. 2014. A NEW RESOURCE LEVELING MODEL FOR THE CONSTRUCTION PROJECT MANAGEMENT OF BUILDING STRUCTURES: THE GENETIC ALGORITHM. European Scientific Journal, ESJ. 10, 27 (Sep. 2014). DOI:https://doi.org/10.19044/esj.2014.v10n27p%p.